Critical path method tutor for construction planning and scheduling /

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: East, E. William (مؤلف)
الشكل: كتاب الكتروني
اللغة:الإنجليزية
منشور في: New York, N.Y. : McGraw-Hill Education LLC., c2015.
الموضوعات:
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!

MARC

LEADER 00000cam a2200000 i 4500
001 14546557
005 20210617105512.0
006 m o d
007 cr||n||||||||n
008 150819s2015||||nyu|||||o|||||||||||eng||
020 |a 9780071849234 (print ISBN) 
020 |a 9780071849234 (hbk.) 
035 |a scn00100201 
040 |a EG-GaU  |c GALALA university  |d EG-GaU  |e rda 
082 0 4 |a 690.0684  |2 23  |b E.E.C. 
100 1 |a East, E. William,  |e author.  |9 1336 
245 1 0 |a Critical path method tutor for construction planning and scheduling /  |c E. William East. 
246 3 0 |a Critical Path Method (CPM) tutor for construction planning and scheduling 
264 1 |a New York, N.Y. :   |b McGraw-Hill Education LLC.,   |c c2015. 
300 |a x, 214 pages :   |b illustrations (black and white) ;   |c 24 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
504 |a Includes bibliographical references and indexes. 
505 0 |a A. About the author -- B. Dedication -- C. Preface -- 1. Why scheduling? -- What is a construction schedule? -- What is a control cycle? -- What is the critical path method? -- How to use cpm? -- 2. A history of project planning -- Bar chart -- Fenced-bar chart -- Line-of-balance -- Arrow diagramming method -- Precedence diagramming method -- Earned value management -- Sequence, duration, and progress -- 3. Arrow diagram method -- Activities -- Sequence -- Duration -- Summary -- 4. Precedence diagram method -- Activities -- Sequence -- Duration -- Summary -- 5. Creating the plan -- Milestones -- Activities -- Sequence -- Cost-loaded schedules -- Known unknowns -- Conclusion -- 6. Using the plan -- Progress updates -- Earned value management -- Change analysis -- Construction claims -- Claims analysis -- 7. Advanced topics -- Resources types -- Limited resource allocation -- Unlimited resource leveling -- Time-cost tradeoff -- Cash-flow analysis -- 8. Planning a mid-rise building -- Examine the contract -- List major contractual obligations -- Divide project into major work areas -- Building method implies sequence -- Find productivity, duration, cost -- Calculate initial schedule -- Schedule adjustments -- Include all important procurement items -- Conclusion -- 9. Exercises -- Cpm diagramming -- Additional cpm diagramming problems -- Resource scheduling -- Time-cost scheduling -- A. Glossary. 
506 |a Access restricted by licensing agreement. 
520 3 |a This unique tool provides a fresh approach to construction scheduling by focusing on ways in which the Critical Path Method (CPM) can be used to manage construction project schedules to meet today's ever-increasing demands to improve operational efficiency and increase profitability. 
530 |a Also issued in online version. 
588 |a Description based on cover image and table of contents, viewed on Aug. 19, 2015. 
590 |a Access is available to the Yale community. 
650 7 |a Building   |x Planning.  |2 GU-sh  |9 1337 
650 7 |a Critical path analysis.  |2 GU-sh  |9 1338 
650 7 |a Production scheduling.  |2 GU-sh  |9 1339 
650 7 |a Construction projects   |x Management.  |2 GU-sh  |9 1340 
730 0 |a McGraw-Hill's AccessEngineering.  |9 1341 
942 |2 ddc  |c BK 
946 |a DO NOT EDIT. DO NOT EXPORT. 
952 |0 0  |1 0  |2 ddc  |4 0  |6 690_068400000000000_E_E_C  |7 0  |9 381  |a MCL  |b MCL  |c T2  |d 2021-06-17  |e Donation  |o 690.0684 E.E.C.  |p E0000561  |r 2021-06-17  |w 2021-06-17  |y BK 
999 |c 79  |d 79